Los Angeles fire rebuilds

Fire rebuilds in Los Angeles, planned as new custom homes.

If your home was lost in the Palisades, Eaton or Franklin fires, you are building a new house on a lot that now has its own rules, its own review path and often new site conditions. We work with your architect and engineers from the first site visit to the final inspection, with the founder on every project.

Whole houses and new homes. Not single rooms.

Living room seating facing a fireplace wall with arched shelves, with glass doors open to a terrace.Living room with light timber floors and wide dark-framed sliding doors to a garden, the kitchen beyond.Open stair with thick timber treads on a single dark steel stringer, a glass balustrade and slim hanging lights in front of a timber panel wall.
Photographs from other Energize projects.

Who this is for

  • Owners rebuilding a single-family home after the Palisades, Eaton or Franklin fires.
  • Owners who already have an architect, or are choosing one now.
  • Lots in Pacific Palisades, Malibu, Altadena and other hillside and canyon areas of Los Angeles.

First, find out who reviews your lot

Your address decides the rules. The three main review paths are different, and a lot near a boundary can surprise you.

Rules checked 16 Nov 2026. Recovery rules change; the official pages are the final word.

Pacific Palisades and other fire areas inside the City of Los Angeles

Who reviews: City of Los Angeles (LADBS, City Planning and other departments)

Under Mayor's Emergency Executive Order 1, "like-for-like" rebuilds within 110% of the original home's footprint and height get expedited review. City departments review complete applications within 30 days and issue clearances within 5 days.

Under Executive Order 8, zoning-compliant single-family homes that are not like-for-like can skip local Coastal Act and CEQA reviews. Only single-family homes in the Coastal Zone can use EO 8.

Source: LA City Recovery: Rebuilding

Altadena and other unincorporated areas of Los Angeles County

Who reviews: Los Angeles County

In the Eaton Fire area, a like-for-like home may grow by up to 10% or 200 square feet, whichever is greater, in floor area, size, height or footprint. In the County's Palisades Fire area, the limit is 10%.

Like-for-like homes do not have to meet current Zoning Code, but they do have to meet current Building, Fire, and Health and Safety codes.

Permits are not issued until Phases 1 and 2 of debris removal are complete. Applications go through EPIC-LA or a One-Stop Permit Center.

Source: LA County: like-for-like rebuild and LA County: apply for permits

Malibu

Who reviews: City of Malibu

"Like-for-like plus 10%" allows substantially the same footprint with an increase of up to 10% in height, square footage and volume. Administrative plan reviews generally take three to six months and may run alongside building plan check.

Homes more than 10% larger, or in a new location on the lot, need a Coastal Development Permit, which the City estimates at 12 to 24 months.

Source: Malibu Rebuilds: rebuilding options

Permit fees and waivers are set by each agency. See LADBS fee waivers and refunds and the Malibu fee waiver.

For the step-by-step permit path, read Fire rebuild permits: Palisades, Malibu and Altadena.

Like-for-like or a new design

Like-for-like is usually the faster path. A new design can give you the house you want now, but it can mean more review time. A few questions help decide:

  • How close is the house you want to the house you lost, in size, height and position on the lot?
  • Is the lot in the Coastal Zone, on a steep slope, or near a setback line?
  • Will your insurance timing and temporary housing hold through a longer review?

We help you and your architect weigh schedule, scope and site conditions before drawings are final. The choice of path is yours and your architect's, made with the reviewing agency.

What is in the ground

Many burned lots sit on hillsides. The City of Los Angeles says engineering plans are required for any proposed structure on a hillside lot. A geotechnical engineer may be required if the structural engineer determines that deeper footings are needed. Building in geologically sensitive areas requires a geology and soils report. (LA City Recovery: Rebuilding)

Before design is final, we review site access, existing foundations and retaining walls, slope and drainage, and how materials and equipment will reach the lot.

Related: Hillside construction in Los Angeles · Caisson and pile foundations

Building for the next fire

Rebuilt homes must meet current fire and building codes. On City of Los Angeles rebuilds, the Fire Department checks plans for hydrant distance, water supply and fire access lanes, and does not clear plans until those are addressed. (LA City Recovery: Rebuilding)

Defensible space around the house is a separate set of rules. See CAL FIRE defensible space zones and fire hazard severity zones.

How a rebuild runs with us

  1. Site and records

    A site visit, a review of what existed before (permits, certificate of occupancy, assessor records) and the site conditions that affect cost and schedule.

  2. Preconstruction with your architect

    Budget and schedule checks while drawings develop, so scope and cost stay aligned.

  3. Permits and plan check

    We help prepare for each agency's comments. The agency issues the permit.

  4. Construction

    Site work, foundations, framing, systems and finishes, with the founder on every project.

  5. Close-out

    Final inspections and handover.

Questions

What does "like-for-like" mean in the City of Los Angeles?

Under Mayor's Emergency Executive Order 1, it covers rebuilds within 110% of the original home's footprint and height. Those projects get expedited review: 30 days for complete applications and 5 days for clearances. Source: LA City Recovery: Rebuilding.

Can I build something different from the house I lost in Pacific Palisades?

Yes. Executive Order 8 lets zoning-compliant single-family homes that are not like-for-like skip local Coastal Act and CEQA reviews. Only single-family homes in the Coastal Zone can use EO 8. Other projects follow the standard review. Source: LA City Recovery: Rebuilding.

How much bigger can a like-for-like home be in Altadena?

In the Eaton Fire area of unincorporated LA County, up to 10% or 200 square feet, whichever is greater, in floor area, size, height or footprint. Source: LA County: like-for-like rebuild.

When can LA County issue my rebuild permit?

Only after Phases 1 and 2 of debris removal are complete. Source: LA County: apply for permits.

How long does Malibu review take?

The City estimates three to six months for an administrative plan review on a like-for-like-plus-10% rebuild, and 12 to 24 months for a Coastal Development Permit when the home is more than 10% larger or in a new location. Source: Malibu Rebuilds: rebuilding options.

What if building codes change during my rebuild?

In the City of Los Angeles, code changes during a rebuild do not require the structure to meet the newer code unless the building permit expires. Source: LA City Recovery: Rebuilding.

Do I need a geotechnical engineer on a hillside lot?

In the City of Los Angeles, engineering plans are required on hillside lots, and a geotechnical engineer may be required if deeper footings are needed. Source: LA City Recovery: Rebuilding.

Do you work with my architect?

Yes. We work with the architect and engineers you choose, from early budget checks through construction. Every project needs its own license and contract check; you can verify our CSLB license #1112649.

Plan your rebuild.

Tell us where the lot is, which agency reviews it, and where your drawings stand. We will tell you what to check next.

13910 Fiji Way Ste 270, Marina del Rey, CA 90292

Licensed general contractor, CSLB #1112649, class B.

Privacy choices

Choose what you share. Both options are off until you allow them, and neither is required to browse or contact us.