Residential construction

Pacific Palisades, California

Pacific Palisades fire rebuilds, built as new custom homes.

Energize Builders rebuilds homes lost in the Palisades Fire as new custom homes, and builds and renovates on the hillside lots other builders decline. Drilled caissons, retaining walls, shoring, Baseline Hillside Ordinance permitting and canyon access are the everyday part of our work. Founder Alik Konovalenko is on every project. Our minimum for a new home or fire rebuild is $1,000,000. Whole-home remodels start at $500,000.

Discuss your project

Fire rebuilds · Hillside homes · Major renovations

Site & scope

What a Palisades rebuild involves before the framing starts.

  1. What is left in the ground

    Assessing the existing foundations is an early part of a fire-rebuild project. We review the available soils, geology and structural information with your project team. The relevant licensed design professionals determine whether existing foundations can be retained; we coordinate the resulting construction scope, access and sequence.

    Test the old foundation before anyone prices the new one.

  2. Caissons, retaining walls and access

    Most Palisades lots slope, and many sit on canyon edges with one narrow way in. Drilled caissons, retaining walls and shoring have to be sequenced around the rig, the crane and the neighbors. We plan that sequence before mobilization, with the survey and the engineers' recommendations in hand, so the structural work below the house is priced and scheduled, not guessed.

    Price and schedule the work below the house before mobilization.

  3. Built to the current fire code

    The applicable wildfire-resistant construction requirements depend on the property, permit application and approved plans. Current California standards include the California Wildland-Urban Interface Code, Title 24, Part 7. We coordinate the specified exterior assemblies, vents, glazing and related details with your design team, then build to the approved documents and inspection requirements.

    Coordinate the required wildfire-resistant assemblies, windows and systems before procurement.

Architects, designers & owners

Give the owner a clear view of the next decision.

Our approach to collaboration

We organize construction questions around the architect's and designer's work, making scope changes and procurement needs visible before they affect the field. A current drawing set, agreed responsibilities and explicit owner decisions help keep a technically complex build understandable.

  • A defined construction scope and clear budget assumptions
  • Early coordination of site work, structure and long-lead materials
  • Traceable decisions against the latest issued drawings

A useful first conversation

What to bring to the table.

Site and records

Bring the property address, survey, prior plans and available permit or recovery correspondence.

Retained or proposed work

Explain whether you are rebuilding, renovating a retained home or developing a substantially new design.

Your design team

Share the current architectural and interior packages and the decisions still open.

Before the build

Questions about rebuilding in Pacific Palisades.

Can you guarantee an expedited rebuild permit?

No. The City of Los Angeles decides eligibility and approval for each proposal. What we can do is prepare the construction information the City asks for, flag scope decisions that change the review path, and keep the permit set and the field work in step. Our article on fire rebuild permits in the Palisades, Malibu and Altadena explains the current path.

Do we have to rebuild the same house?

No. You and your architect can change the layout, the size and the design. Changes can move a project out of the like-for-like recovery path and into standard review, which affects timing, site requirements and budget, so we check those implications with you before the design is committed.

What does a Palisades rebuild cost?

It depends on the lot, the design and the foundation work, so we price from the drawings rather than quoting a figure per square foot. So you have it up front: our minimum for a new home or fire rebuild is $1,000,000, excluding land, design fees and furnishings.

Have you built on hillside lots like these?

Yes. Chalon Road in Mandeville Canyon and St Ives Drive in the Hollywood Hills are ground-up hillside builds, and our current work includes drilled caisson foundations on Macapa Drive in the Hollywood Hills. See the hillside construction and caisson foundation pages for how that work is planned.

Local planning resources

Use the relevant authority’s current guidance for your property and proposed work.

Your next home

Send us your lot and your drawings.

Start a conversation
Pause motion