Approvals and building systems
Bring energy compliance into the design.
Title 24 is California’s Building Standards Code; the Energy Code is Part 6 of that broader set of standards. For a home addition, energy compliance belongs in the design and specification process. It should not arrive as an unexplained form after the important building decisions have been made.

In this article
Confirm the edition and the project classification.
The California Energy Commission identifies January 1, 2026 as the general application date for the 2025 Energy Code. Ask the design team and authority to confirm the edition governing the actual application and scope.
Special recovery provisions can affect qualifying wildfire rebuilds. CEC guidance describes exceptions allowing eligible projects to use earlier requirements. Do not assume that an ordinary addition and a qualifying fire rebuild follow the same code path.
Coordinate the envelope with the architecture.
Windows, glazing area, insulation and other envelope decisions should be reviewed together with the applicable compliance approach. Climate zone, project classification and the chosen design matter; a single insulation or window value is not a universal specification for every addition.
Give the energy consultant current drawings and product information. If a major opening or assembly changes, ask whether the compliance documentation needs revision before the altered product is ordered.

Align the system design with the proposed rooms.
Coordinate heating, cooling, ventilation, water heating and lighting as applicable to the project. Establish how the addition relates to retained systems and where specialist design or assessment is required.
The builder should receive clear approved information for installation. Energy documentation, architectural drawings and equipment schedules should describe the same proposal, with discrepancies resolved by the responsible professionals.
Assign the documents and checks.
Ask who prepares the compliance documents, who records installation and which field verification or diagnostic testing applies. The CEC publishes distinct forms for different single-family work categories; the team should select the correct documents for the actual project.
Required Energy Code verification is separate from any optional wellness testing or laboratory programme. Identify the purpose, responsible provider and acceptance evidence for each, without implying one certifies the other.
Manage substitutions through completion.
Keep proposed product substitutions visible to the design and energy team. A similar-looking window or piece of equipment may not match the documented specification. Resolve the implications before installation rather than relying on appearance or a sales description.
At handover, gather the applicable compliance and verification records with the project documents. The owner should understand what was specified, what was installed and what checks were required, without needing to reconstruct that information from emails.
Questions for the first meeting
- Applicable edition and scope classification
- Current envelope and system information
- Named compliance and verification responsibilities
- Reviewed product substitutions
- Installation and completion records
Further information
Review the references below with your project team. Confirm local requirements with the responsible authority and product-specific requirements with the manufacturer.